Cases

實績案例_南化給水廠

Taiwan Water Corporation Nanhua Water Supply Plant

Environment Introduction:

  • Location is Nanhua water purification plant, total 8 sets sedimentation equipment, and total 8 drainage tank are surrounded.
  • 2 sets 3HP pump are installed in ease slurryu drainage tank originally, total 16 sets 3HP pumps. Previously have been replaced to total 3 sets 10HP pumps at 3 location, this case to replace total 5 sets 10HP pumps at other five drainage tank.


Requirement Explanation:

  1. Due to high viscosity of slurry, original 3HP pump will stop operate by slurry, so need to replace to 10HP pump.
  2. All water in sedimentation tank need to be drained when maintain the equipment, original 3HP pump is unable to drain in time, so need to replace to 10HP pump.
  3. As the water volume increases in the rainy season, original 3HP pump is unable to drain in time, so need to replace to 10HP pump.


Installation Model:

  • AS-3105/3Φ/440V total 5 sets


興達室內煤場之排水系統案

Taipower Xingda Power Plant

Environment Introduction:

  • Above equipment are installed at total 2 Xinda new indoor coal yard in order to offer more power to fire power plant.


Requirement Explanation:

  • Draining system is designed for new coal yard, total two catchment in each coal yard. 2 sets 3HP are installed in each catchment which can drain water in time when raining or flood.


Installation Model:

  • TOS-B-333*440V*8 sets


澎湖百世多麗酒店

Penghu Pescadores Hotel

Environment Introduction:

  1. This case is swage treatment project of Penghu Pescadores hotel.
  2. This project is divided into two areas and designed by grading process to achieve sewage treatment function in each tank.


Requirement Explanation:

  • Above equipment are installed in tank of initial sinking, adjustment, final sinking, filtering, circulation, intermediate, draining...etc. according to different function.


Installation Model:

  1. TOS-B-333*6 sets
  2. TOS-B-353*2 sets (B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)


國防部鳳山協和新村

Ministry of National Defense Fengshan Xiehe Xincun

Environment Introduction:

  1. This case is dependent village sewage reconstruction project of ministry of national defense Fengshan Xiehe Xincun.
  2. This project is divided into four areas and designed by grading process to achieve sewage treatment function in each tank.


Requirement Explanation:

  • Above equipment are installed in tank of initial sinking, adjustment, final sinking, filtering, circulation, intermediate, draining...etc. according to different function.


Installation Model:

  • TOS-B-312*4 sets
  • TOS-B-323*8 sets
  • TOS-B-333*4 sets
  • TOS-B-353*8 sets
  • TOS-B-3754*4 sets (B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)


國防部高山頂營區

Ministry of National Defense Alpine Top Campsite

Environment Introduction:

  1. This case is phase I and phase II reconstruction project of ministry of national defense alpine top campsite.
  2. This project is divided into eight areas and designed by grading process to achieve sewage treatment function in each tank.


Requirement Explanation:

  • Above equipment are installed in regulating、drainage tank.


Installation Model:

  • TOS-B-323*58 sets
  • TOS-B-3052*44 sets(B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)


台灣師大學生宿舍大樓

Taiwan Normal University Student Dormitory

Environment Introduction:

  • This case is sewage water improvement project of student dormitory in Taiwan Normal University student dormitory


Requirement Explanation:

  • Above equipment are installed in regulating、drainage tank according to different function.


Installation Model:

  • TOS-B-312*6 sets
  • TOS-B-333*2 sets (B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)


交通大學田家炳教育中心

Chiao Tung University Education Center

Environment Introduction:

  1. This case is education center new building project in Chiao Tung University.
  2. This project is designed by grading process to achieve sewage treatment function in each tank.


Requirement Explanation:

  • Above equipment are installed in regulating、drainage tank.


Installation Model:

  1. TOS-B-3052*3 sets
  2. TOS-B-323*2 sets (B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)


新店美麗新世界新建案

Xindian New Building Project

Environment Introduction:

  1. This case is sewage treatment project of Xindian New Building.
  2. This project is divided into three areas and designed by grading process to achieve sewage treatment function in each tank.


Requirement Explanation:

  • Above equipment are installed in tank of initial sinking, adjustment, final sinking, filtering, circulation, intermediate, draining...etc. according to different function.


Installation Model:

  • TOS-B series 0.5HP*4 sets
  • TOS-B series 1HP*11 sets
  • TOS-B series 2HP*4 sets
  • TOS-B series 3HP*6 sets (B Series Non-Clog Sewage Submersible Pump with Auto Lifting Device)